CNC, Birmingham

Reason for Installation: New Heating required in Machine Shop.

Solution: Installed a VS25DL radiant tube heater with Smartcom control unit and black bulb Sensor, with flue extraction sealed on roof. A New Gas Distribution Pipework leg was suspended from building steel structure off of existing Gas pipe.