Trade Centre, Bristol

Reason for Installation: The trade centre needed the extension Heating and more space was needed in the existing shop and goods in area.

Solution: We supplied and fitted 3 suspended warm air units to replace the existing floor standing heaters in the main shop area, the extension was fitted with 3 warm air UDSA suspended heaters and the Goods in area had 1 x UDSA Warm Air heater unit . All heaters were operated via programmable Smartcom control units. All heaters were integrated into the existing Vicker system.